Tupras HDPE Project

Tanks

>Tupras HDPE Project

5.000 m 28" CS Pipe Installation
1.950 ea Valve Installation
16.000 m³ Excavation with manual
25.000 m³ Excavation with mechanical
100 tons Reinforced steel works
6.500 m² Formwork
2.000 m³ (Prepared) Concrete Works
30.000 m³ Filling works
12.450 m HDPE pipe Installation

 

 

 

 

 